Building a house is a multi-phase process, and the costs are typically spread across several key stages. Knowing the estimated percentage cost per stage helps in budgeting effectively and avoiding surprises. Here’s a breakdown of how the costs are generally distributed across different stages of home construction.


1. Planning and Design (5-15%)

This stage includes costs related to architectural design, engineering, project management, and securing permits.

  • Architect Fees: Usually around 5-10% of the total construction cost. An architect helps design the house layout, ensure compliance with building regulations, and tailor the design to your needs.

  • Permit Fees: Typically 2-5%, which includes fees for building permits, zoning, and other required clearances from local authorities.

Total Estimate: 5-15% of the total project cost.


2. Site Preparation and Foundation (10-15%)

The site preparation involves clearing the land, grading, and excavating to prepare for the foundation. The foundation itself is one of the most crucial components of the structure.

  • Land Clearing and Grading: Generally about 3-5% of the total cost, especially if the land is sloped or has obstructions.

  • Foundation Construction: Laying the foundation usually takes up 7-10% of the total cost, depending on the type of foundation and whether the land is in a flood-prone area.

Total Estimate: 10-15% of the total project cost.


3. Structural Work (20-30%)

This phase covers the construction of the frame, roof, and walls, which form the skeleton of the house. It is one of the most cost-intensive stages.

  • Framing: The cost of framing typically represents 10-15% of the total budget. This includes wood, steel, or other materials used for the structural framework.

  • Roofing: Roofing materials and installation generally account for 5-10%, depending on the quality and type of materials chosen.

  • Walls: Exterior and interior wall construction usually contributes another 5-10% to the overall cost.

Total Estimate: 20-30% of the total project cost.


4. Utilities Installation (10-15%)

This stage includes the installation of plumbing, electrical, and HVAC systems. It's critical to ensure that these systems are properly installed to avoid costly repairs down the line.

  • Plumbing and Electrical: Combined, plumbing and electrical systems usually account for 5-10% of the total budget.

  • HVAC Systems: Heating, ventilation, and air conditioning installation often makes up 5-7% of the total cost.

Total Estimate: 10-15% of the total project cost.


5. Interior and Exterior Finishing (25-35%)

Finishing costs include everything from drywall, flooring, and painting to the installation of doors, windows, and fixtures. This stage tends to be the most variable because material choices (e.g., high-end vs. standard finishes) can significantly impact the budget.

  • Interior Finishing: Drywall, flooring, and painting typically consume around 10-15% of the total budget. High-end finishes like premium tiles or hardwood floors will drive costs higher.

  • Fixtures and Fittings: The installation of kitchen cabinets, bathroom fixtures, lighting, and other fittings usually accounts for 5-10%.

  • Exterior Finishing: Windows, doors, and exterior cladding or paint often cost 5-10% of the total budget.

Total Estimate: 25-35% of the total project cost.


6. Final Inspection and Landscaping (5-10%)

This stage covers the final touches on the property, such as landscaping, fencing, and paving. It also includes any costs for final inspections and certifications.

  • Landscaping: Typically 3-5% of the total project cost, depending on the size of the lot and complexity of the landscaping design.

  • Final Inspections: Final inspections and adjustments to ensure everything complies with local building codes usually take up 2-3%.

Total Estimate: 5-10% of the total project cost.


Sample Cost Breakdown for a PHP 3,000,000 Home:

  • Planning and Design (5-15%): PHP 150,000 - PHP 450,000

  • Site Preparation and Foundation (10-15%): PHP 300,000 - PHP 450,000

  • Structural Work (20-30%): PHP 600,000 - PHP 900,000

  • Utilities Installation (10-15%): PHP 300,000 - PHP 450,000

  • Interior and Exterior Finishing (25-35%): PHP 750,000 - PHP 1,050,000

  • Final Inspection and Landscaping (5-10%): PHP 150,000 - PHP 300,000


The cost to build a house in Cagayan de Oro can vary greatly depending on your design preferences, materials, and finishes. By understanding the percentage costs of each stage of construction, you can better allocate your budget and avoid unexpected expenses. Proper planning, selecting a reputable contractor, and making informed decisions on materials will help you stay within your budget while building your dream home.


Estimated Percentage Cost per Stages in Home Building
Estimated Percentage Cost per Stages in Home Building

21 views0 comments


Building a house is a significant endeavor, and the timeline can vary depending on various factors such as the size, complexity, materials, and efficiency of the contractor. In Cagayan de Oro, like in other parts of the Philippines, building a house typically takes anywhere from 6 months to 1 year, depending on these variables. Let's break down the different stages of construction and what influences the timeline.


1. Planning and Design Phase (1 to 3 months)

Before construction begins, you'll need to go through the planning and design phase. This involves working with an architect to finalize your house plans, securing necessary permits, and setting a project budget. In Cagayan de Oro, securing building permits can take a few weeks to a couple of months, depending on the complexity of the project and the local government's processing time.

Key Factors:

  • Complexity of the design (custom homes may take longer)

  • Time to secure building permits from the local government​

2. Site Preparation and Foundation (1 to 2 months)

Once your permits are approved, site preparation begins. This involves clearing the land, leveling it, and laying the foundation. In Cagayan de Oro, factors such as soil type, terrain, and accessibility of the site can impact how long this stage takes.

Key Factors:

  • Site condition (e.g., sloping land or rocky soil may take longer)

  • Availability of labor and machinery​

3. Structural Work (3 to 6 months)

The bulk of the construction happens during this phase, where the foundation is followed by the construction of walls, roofs, and floors. In Cagayan de Oro, many contractors aim to complete the structural phase within 3 to 6 months, depending on the size and type of materials used. A single-story house might be quicker to build than a multi-story home.

Key Factors:

  • Size and complexity of the home

  • Weather conditions (rainy seasons in Northern Mindanao can delay work)

  • Availability of materials (some delays may occur if materials need to be shipped from other regions)

4. Finishing Phase (2 to 4 months)

After the structure is completed, the finishing phase begins, which includes installing windows, doors, electrical systems, plumbing, flooring, and painting. This is where customization can add time to the project. In Cagayan de Oro, finishing typically takes 2 to 4 months, but it may take longer if high-end materials are used or if custom interiors are being added.

Key Factors:

  • Quality of finishes and materials

  • Availability of skilled tradespeople (plumbers, electricians, carpenters)

  • Custom interior designs or upgrades​

5. Inspection and Final Touches (1 month)

After the main construction work is done, the house undergoes a final inspection. This includes checking if the house meets local building codes and ensuring that everything is functional and safe. In Cagayan de Oro, getting the house inspected and making final adjustments could take about a month.


In Cagayan de Oro, the total time to build a house can range from 6 months to 1 year, depending on the project scope and various external factors such as weather, materials availability, and the efficiency of the construction team. Planning well, hiring experienced contractors, and anticipating possible delays (such as seasonal weather) can help ensure your project stays on track.


How Long Does It Take to Build a House in Cagayan de Oro?
How Long Does It Take to Build a House in Cagayan de Oro?

0 views0 comments

Building a house is a significant investment and a major life project, especially in a growing city like Cagayan de Oro (CDO). To ensure your construction journey is smooth, it’s essential to understand the stages involved and the processes required for a successful build. Below is a step-by-step guide to help you navigate the house construction process in CDO.

1. Planning and Budgeting

a) Set a Budget

Before any construction begins, it's important to establish a realistic budget. This should include costs for land, materials, labor, permits, and contingency funds (typically around 10-15% of the total budget for unexpected expenses).

b) Choose a Design

Hire an architect or a design professional to help you conceptualize your dream home. The design phase should align with your budget and needs while factoring in the local climate and regulations.

  • Local Example: In Cagayan de Oro, tropical designs that promote natural ventilation and lighting are popular due to the climate.

c) Select a Contractor

Choose a licensed contractor with experience in the CDO area.


2. Securing Land and Permits

a) Land Purchase

If you haven’t purchased land yet, now is the time to do so. Work with a real estate agent to find a lot that fits your needs in terms of location, size, and budget.

b) Get Building Permits

Once the design is finalized, you'll need to secure the necessary permits from the Office of the Building Official (OBO) in Cagayan de Oro. The permits will include:

  • Building Permit

  • Zoning Permit

  • Electrical and Plumbing Permits

The cost of securing permits will depend on the size and complexity of your project, typically ranging from PHP 10,000 to PHP 50,000 for a standard residential home.

3. Site Preparation and Foundation

a) Site Clearing

Before construction begins, the site needs to be prepared. This involves clearing vegetation, rocks, and any existing structures. Excavation for the foundation also takes place during this stage.

b) Foundation Laying

The foundation is one of the most critical parts of your house. Contractors will dig trenches and pour concrete for the footings. In CDO, special attention must be paid to flood-prone areas, so you may need to consider a raised foundation if the site is susceptible to flooding.

4. Structural Work: Framing, Roofing, and Walls

a) Framing

Framing is the skeleton of your home. It includes the installation of beams and columns that provide structural support for the walls and roof.

b) Roofing

Once the frame is up, the roof is installed. Roofing materials will depend on your budget and design preferences, with options ranging from galvanized steel to tile or asphalt shingles. Roofing must be designed to withstand CDO’s weather, particularly heavy rains and typhoons.

c) Wall Construction

Exterior and interior walls are built after the roofing is completed. Builders may use various materials like concrete blocks, wood, or prefabricated panels, depending on the design.

5. Utilities Installation: Electrical, Plumbing, and HVAC

a) Plumbing and Electrical Systems

Before walls are fully closed up, contractors will install essential utilities such as:

  • Electrical wiring

  • Plumbing for water supply and drainage

  • HVAC (Heating, Ventilation, and Air Conditioning) if applicable

Ensure that licensed professionals handle these installations to meet Philippine electrical and plumbing standards.

b) Inspection

At this stage, it's common for local authorities to inspect the construction to ensure compliance with safety and building codes.

6. Interior and Exterior Finishing

a) Interior Finishing

Once the utilities are installed, finishing work begins. This includes:

  • Drywall installation or plastering

  • Painting and flooring (tiles, wood, or vinyl)

  • Cabinetry and fixtures installation The choice of materials will significantly affect the overall cost of your home, so opt for those that balance quality and budget.

b) Exterior Finishing

This stage includes installing windows, doors, exterior paint, and any cladding or siding that adds to the home’s aesthetic and weatherproofing.

7. Final Inspection and Handover

Once construction is complete, your contractor will schedule a final inspection with local authorities to ensure the house complies with all safety and building codes. After passing the inspection, you’ll receive a Certificate of Occupancy, allowing you to legally move into your new home.

a) Final Walkthrough

Before the handover, conduct a final walkthrough with your contractor to ensure all agreed-upon work is completed and meets your expectations. This is also the time to address any final touch-ups or fixes.


Building a house in Cagayan de Oro involves multiple stages, from budgeting and planning to securing permits and managing construction. Understanding each phase can help ensure a smooth process and avoid unexpected delays or costs. With the right contractor and careful planning, building your dream home in CDO can be a rewarding experience, providing a custom living space that meets your needs and stands the test of time.