Estimated Percentage Cost per Stages in Home Building

Building a house is a multi-phase process, and the costs are typically spread across several key stages. Knowing the estimated percentage cost per stage helps in budgeting effectively and avoiding surprises. Here’s a breakdown of how the costs are generally distributed across different stages of home construction.


1. Planning and Design (5-15%)

This stage includes costs related to architectural design, engineering, project management, and securing permits.

  • Architect Fees: Usually around 5-10% of the total construction cost. An architect helps design the house layout, ensure compliance with building regulations, and tailor the design to your needs.

  • Permit Fees: Typically 2-5%, which includes fees for building permits, zoning, and other required clearances from local authorities.

Total Estimate: 5-15% of the total project cost.


2. Site Preparation and Foundation (10-15%)

The site preparation involves clearing the land, grading, and excavating to prepare for the foundation. The foundation itself is one of the most crucial components of the structure.

  • Land Clearing and Grading: Generally about 3-5% of the total cost, especially if the land is sloped or has obstructions.

  • Foundation Construction: Laying the foundation usually takes up 7-10% of the total cost, depending on the type of foundation and whether the land is in a flood-prone area.

Total Estimate: 10-15% of the total project cost.


3. Structural Work (20-30%)

This phase covers the construction of the frame, roof, and walls, which form the skeleton of the house. It is one of the most cost-intensive stages.

  • Framing: The cost of framing typically represents 10-15% of the total budget. This includes wood, steel, or other materials used for the structural framework.

  • Roofing: Roofing materials and installation generally account for 5-10%, depending on the quality and type of materials chosen.

  • Walls: Exterior and interior wall construction usually contributes another 5-10% to the overall cost.

Total Estimate: 20-30% of the total project cost.


4. Utilities Installation (10-15%)

This stage includes the installation of plumbing, electrical, and HVAC systems. It's critical to ensure that these systems are properly installed to avoid costly repairs down the line.

  • Plumbing and Electrical: Combined, plumbing and electrical systems usually account for 5-10% of the total budget.

  • HVAC Systems: Heating, ventilation, and air conditioning installation often makes up 5-7% of the total cost.

Total Estimate: 10-15% of the total project cost.


5. Interior and Exterior Finishing (25-35%)

Finishing costs include everything from drywall, flooring, and painting to the installation of doors, windows, and fixtures. This stage tends to be the most variable because material choices (e.g., high-end vs. standard finishes) can significantly impact the budget.

  • Interior Finishing: Drywall, flooring, and painting typically consume around 10-15% of the total budget. High-end finishes like premium tiles or hardwood floors will drive costs higher.

  • Fixtures and Fittings: The installation of kitchen cabinets, bathroom fixtures, lighting, and other fittings usually accounts for 5-10%.

  • Exterior Finishing: Windows, doors, and exterior cladding or paint often cost 5-10% of the total budget.

Total Estimate: 25-35% of the total project cost.


6. Final Inspection and Landscaping (5-10%)

This stage covers the final touches on the property, such as landscaping, fencing, and paving. It also includes any costs for final inspections and certifications.

  • Landscaping: Typically 3-5% of the total project cost, depending on the size of the lot and complexity of the landscaping design.

  • Final Inspections: Final inspections and adjustments to ensure everything complies with local building codes usually take up 2-3%.

Total Estimate: 5-10% of the total project cost.


Sample Cost Breakdown for a PHP 3,000,000 Home:

  • Planning and Design (5-15%): PHP 150,000 - PHP 450,000

  • Site Preparation and Foundation (10-15%): PHP 300,000 - PHP 450,000

  • Structural Work (20-30%): PHP 600,000 - PHP 900,000

  • Utilities Installation (10-15%): PHP 300,000 - PHP 450,000

  • Interior and Exterior Finishing (25-35%): PHP 750,000 - PHP 1,050,000

  • Final Inspection and Landscaping (5-10%): PHP 150,000 - PHP 300,000


The cost to build a house in Cagayan de Oro can vary greatly depending on your design preferences, materials, and finishes. By understanding the percentage costs of each stage of construction, you can better allocate your budget and avoid unexpected expenses. Proper planning, selecting a reputable contractor, and making informed decisions on materials will help you stay within your budget while building your dream home.