How Long Does It Take to Build a House in Cagayan de Oro?


Building a house is a significant endeavor, and the timeline can vary depending on various factors such as the size, complexity, materials, and efficiency of the contractor. In Cagayan de Oro, like in other parts of the Philippines, building a house typically takes anywhere from 6 months to 1 year, depending on these variables. Let's break down the different stages of construction and what influences the timeline.


1. Planning and Design Phase (1 to 3 months)

Before construction begins, you'll need to go through the planning and design phase. This involves working with an architect to finalize your house plans, securing necessary permits, and setting a project budget. In Cagayan de Oro, securing building permits can take a few weeks to a couple of months, depending on the complexity of the project and the local government's processing time.

Key Factors:

  • Complexity of the design (custom homes may take longer)

  • Time to secure building permits from the local government​

2. Site Preparation and Foundation (1 to 2 months)

Once your permits are approved, site preparation begins. This involves clearing the land, leveling it, and laying the foundation. In Cagayan de Oro, factors such as soil type, terrain, and accessibility of the site can impact how long this stage takes.

Key Factors:

  • Site condition (e.g., sloping land or rocky soil may take longer)

  • Availability of labor and machinery​

3. Structural Work (3 to 6 months)

The bulk of the construction happens during this phase, where the foundation is followed by the construction of walls, roofs, and floors. In Cagayan de Oro, many contractors aim to complete the structural phase within 3 to 6 months, depending on the size and type of materials used. A single-story house might be quicker to build than a multi-story home.

Key Factors:

  • Size and complexity of the home

  • Weather conditions (rainy seasons in Northern Mindanao can delay work)

  • Availability of materials (some delays may occur if materials need to be shipped from other regions)

4. Finishing Phase (2 to 4 months)

After the structure is completed, the finishing phase begins, which includes installing windows, doors, electrical systems, plumbing, flooring, and painting. This is where customization can add time to the project. In Cagayan de Oro, finishing typically takes 2 to 4 months, but it may take longer if high-end materials are used or if custom interiors are being added.

Key Factors:

  • Quality of finishes and materials

  • Availability of skilled tradespeople (plumbers, electricians, carpenters)

  • Custom interior designs or upgrades​

5. Inspection and Final Touches (1 month)

After the main construction work is done, the house undergoes a final inspection. This includes checking if the house meets local building codes and ensuring that everything is functional and safe. In Cagayan de Oro, getting the house inspected and making final adjustments could take about a month.


In Cagayan de Oro, the total time to build a house can range from 6 months to 1 year, depending on the project scope and various external factors such as weather, materials availability, and the efficiency of the construction team. Planning well, hiring experienced contractors, and anticipating possible delays (such as seasonal weather) can help ensure your project stays on track.