How to expedite permits?

To expedite the process of securing construction permits, it's essential to follow best practices and proactive strategies. Here are some key approaches:

1. Ensure Complete and Accurate Documentation

Incomplete or incorrect documents are one of the main causes of delays. Before submitting your application, double-check that you have all necessary documents (e.g., architectural plans, zoning clearance, structural designs) and that they meet local building code requirements.

Tip: Work with a licensed architect or contractor who has experience with local requirements to ensure everything is correct from the start


2. Hire a Licensed Professional

Engaging a licensed architect, engineer, or contractor who is familiar with the local permit process can significantly speed things up. They often have existing relationships with local authorities and can ensure that your plans meet all necessary regulations before submission.

Tip: A professional contractor can also pre-emptively address common issues that cause delays, such as right-of-way disputes or non-compliance with local zoning laws​


3. Submit Digital Applications (if available)

Many local governments are digitizing their permit systems to improve efficiency. Check if your local government has an online permit application system. This can save time on travel and waiting in lines and often includes real-time tracking of your application's progress.

Tip: Using online platforms ensures faster submission and communication with local authorities​


4. Regular Follow-Ups

After submitting your application, follow up with the local planning office regularly to ensure there are no additional requirements or delays. Timely communication can help you address issues early and avoid lengthy delays.

Tip: Politely and consistently follow up to show your eagerness to move forward, which can help keep your application top of mind for busy officials


5. Prepare for Inspections Early

During the construction phase, regular inspections are often required. Make sure to schedule these inspections early and be prepared for them. Being proactive in ensuring that your site is compliant with safety and building regulations can prevent delays due to failed inspections.

Tip: Have your contractor coordinate with inspectors well in advance to reduce wait times​(


6. Engage with Local Government Early

Prior to even submitting your application, it may be helpful to engage with local officials or the Office of the Building Official (OBO) to ask about potential challenges or common issues that slow down the process. By understanding the specific concerns of the local government, you can preemptively address them in your application.

Tip: Building a good relationship with your local government contacts can lead to faster processing and fewer issues down the road


7. Anticipate and Address Environmental and Zoning Issues

If your project is in an environmentally sensitive area or falls under strict zoning laws, address these issues before submission. Securing zoning clearance or an Environmental Compliance Certificate (ECC) early in the process can prevent significant delays later on.

Tip: Consult with an environmental specialist if your project involves sensitive ecosystems or large-scale developments that might require extensive reviews​


By implementing these strategies, you can significantly reduce the time it takes to secure construction permits.