Step-by-Step Guide to Planning and Building a House: Process, Cost, and Timeline

Writer's picture: Gabriel MikaelGabriel Mikael

Building a house is a major investment that requires careful planning, budgeting, and execution. This guide provides a step-by-step breakdown of the process, estimated costs in Philippine Pesos, and timelines to help you successfully build your dream home.

Step 1: Define Your Budget and Financing

Process:

  • Determine how much you can afford based on your savings and available financing.

  • Consult with banks or lenders for mortgage or construction loan options.

  • Include land cost, construction materials, labor, permits, and contingency funds.

Estimated Cost:

  • Land: Varies based on location.

  • Construction cost: PHP 56,000 - PHP 168,000 per square meter.

  • Permits and fees: PHP 280,000 - PHP 1,120,000.

  • Design and architectural fees: 5% - 15% of construction cost.

Timeline:

  • 1-2 months for financing approval and budgeting.

Step 2: Find and Purchase Land

Process:

  • Identify a suitable location based on budget and lifestyle.

  • Check zoning regulations and building codes.

  • Conduct a land survey and soil testing.

  • Finalize the purchase with legal documentation.

Estimated Cost:

  • Land prices vary significantly based on location.

  • Survey and soil testing: PHP 56,000 - PHP 168,000.

Timeline:

  • 1-3 months for searching and purchasing land.

Step 3: Design Your Home

Process:

  • Work with an architect or use pre-designed plans.

  • Plan the layout, size, number of rooms, and style.

  • Consider sustainability and energy-efficient designs.

  • Get structural and engineering approvals.

Estimated Cost:

  • Custom architectural plans: PHP 280,000 - PHP 2,800,000.

  • Pre-designed plans: PHP 28,000 - PHP 280,000.

Timeline:

  • 1-3 months for design and approvals.

Step 4: Obtain Permits and Approvals

Process:

  • Submit plans to local authorities for building permits.

  • Secure environmental, zoning, and utility permits.

  • Ensure compliance with safety and building codes.

Estimated Cost:

  • PHP 280,000 - PHP 1,120,000 depending on location.

Timeline:

  • 1-3 months for permit approval.

Step 5: Hire a Contractor and Finalize Materials

Process:

  • Choose between a general contractor or self-managing subcontractors.

  • Obtain bids and sign contracts.

  • Select building materials, finishes, and fixtures.

Estimated Cost:

  • Contractor fees: 10% - 20% of total construction cost.

  • Material costs vary based on quality and availability.

Timeline:

  • 1-2 months for contractor selection and material procurement.

Step 6: Site Preparation and Foundation Work

Process:

  • Clear and level the land.

  • Install temporary utilities.

  • Excavate and lay the foundation (slab, crawl space, or basement).

Estimated Cost:

  • Site preparation: PHP 280,000 - PHP 840,000.

  • Foundation: PHP 560,000 - PHP 2,800,000.

Timeline:

  • 1-2 months for site prep and foundation.

Step 7: Framing and Structural Work

Process:

  • Construct the frame (walls, roof, and floors).

  • Install sheathing, roofing, and exterior finishes.

  • Ensure structural integrity and wind resistance.

Estimated Cost:

  • Framing: PHP 1,120,000 - PHP 2,800,000.

  • Roofing: PHP 280,000 - PHP 1,120,000.

Timeline:

  • 2-3 months.

Step 8: Install Plumbing, Electrical, and HVAC

Process:

  • Run plumbing lines, install water heaters.

  • Set up electrical wiring, outlets, and lighting.

  • Install heating, ventilation, and air conditioning (HVAC) systems.

Estimated Cost:

  • Plumbing: PHP 280,000 - PHP 1,120,000.

  • Electrical: PHP 280,000 - PHP 840,000.

  • HVAC: PHP 560,000 - PHP 1,680,000.

Timeline:

  • 1-2 months.

Step 9: Interior Finishes and Fixtures

Process:

  • Install insulation, drywall, flooring, and painting.

  • Add kitchen cabinets, countertops, and bathroom fixtures.

  • Set up doors, windows, and lighting fixtures.

Estimated Cost:

  • Drywall and paint: PHP 280,000 - PHP 1,120,000.

  • Flooring: PHP 280,000 - PHP 1,680,000.

  • Kitchen and bathroom fixtures: PHP 560,000 - PHP 2,800,000.

Timeline:

  • 2-4 months.

Step 10: Final Inspections and Moving In

Process:

  • Conduct final building inspections.

  • Secure occupancy permit.

  • Complete landscaping and driveway.

  • Move into your new home!

Estimated Cost:

  • Inspection fees: PHP 28,000 - PHP 112,000.

  • Landscaping: PHP 168,000 - PHP 840,000.

Timeline:

  • 1-2 months.

Total Estimated Cost and Timeline

Total Cost:

  • Basic home: PHP 8,400,000 - PHP 16,800,000.

  • Mid-range home: PHP 16,800,000 - PHP 33,600,000.

  • Luxury home: PHP 33,600,000+.

Total Timeline:

  • 12-24 months from planning to move-in.

Building a house in the Philippines is a significant journey that requires strategic planning and budgeting. By following this step-by-step guide, you can effectively manage costs, timelines, and construction quality. Hiring experienced professionals and staying actively involved in the process will ensure a smooth building experience and help you create a home that suits your needs and budget.


Step-by-Step Guide to Planning and Building a House: Process, Cost, and Timeline
Step-by-Step Guide to Planning and Building a House: Process, Cost, and Timeline


Recent Posts

See All

Comments


Contact Us

Unit S1 Bldg C RandB Plaza Masterson Avenue Upper Balulang , Cagayan de Oro

9000, Philippines

+63936-540-0689

© 2023 by Wallpro Systems & Construction Inc. All rights reserved.

Thanks for submitting!

+63919-161-0258

bottom of page