In the Philippines, the permit fees for constructing a house or building can vary based on the size, location, and complexity of the project. Here’s a general breakdown of the most common fees you can expect to encounter when applying for construction permits in areas like Cagayan de Oro:
1. Building Permit Fees
The building permit fee is usually based on the floor area of the structure and the type of building (e.g., residential, commercial).
For residential structures, the fees generally range from ₱23 to ₱28 per square meter for buildings up to two stories. High-rise buildings, commercial properties, or more complex structures may have higher fees, ranging from ₱50 to ₱100 per square meter.
A 100-square-meter residential house may therefore incur a building permit fee of ₱2,300 to ₱2,800
2. Zoning Permit Fee
The zoning permit fee depends on the project’s location and its compliance with local zoning laws. Fees typically range from ₱1,000 to ₱2,000 for standard residential projects but can be higher for commercial or industrial buildings
3. Sanitary Permit Fee
The sanitary permit ensures that the project meets health and sanitation standards, particularly for plumbing systems and water supply. This fee can range from ₱1,000 to ₱3,000, depending on the complexity of the plumbing work involved.
4. Electrical Permit Fee
For electrical installations, the electrical permit costs range from ₱500 to ₱1,500, depending on the size and complexity of the system being installed. Larger projects or commercial buildings may face higher fees.
5. Fire Safety Evaluation Fee
The Bureau of Fire Protection (BFP) charges a fee for evaluating the fire safety systems of the building. This fee typically ranges from ₱1,000 to ₱5,000, depending on the size and nature of the project
6. Other Administrative and Miscellaneous Fees
Processing Fees: These fees vary but can range from ₱500 to ₱2,000 for handling the application.
Inspection Fees: Some LGUs charge additional fees for inspections during and after construction, ranging from ₱500 to ₱1,500.
Occupancy Permit Fee: After the construction is complete, an occupancy permit will be required, with fees ranging from ₱1,000 to ₱5,000 depending on the size of the building.
For a typical residential house of 100 square meters in Cagayan de Oro, expect the total permit fees to range from ₱10,000 to ₱30,000, depending on the project complexity and local government rates.
These costs can vary, so it’s essential to check with your local Office of the Building Official (OBO) for the most accurate fee schedule.
Comments